Project Name: Bloomingdale Road Reconstruction (61H46)

Project Start: April 25, 2022

Project Completion: November 30,2022

Bid Price: $2,985,000

Project Summary

The project will consist of reconstruction and resurfacing of Bloomingdale Road from Irving Park Road to Rohlwing Road (IL-53) .  Reconstruction of Bloomingdale Road to an urban cross section will be from approximately Walnut Street to the Village limits west of Lombard Road which will consist of pavement widening, installation of curb and gutter, storm sewer improvements, culvert improvements and stamped asphalt cross walks. The remaining portions of Bloomingdale Road will be resurfaced.  There will be a portion of Bloomingdale Road (maintained by Addison Township) that will remain a rural cross section with roadside ditches near the bridge over I-290.  

During construction, Bloomingdale will be closed to eastbound traffic.  One-way westbound traffic will be maintained from Irving Park Road to Rohlwing Road (IL-53).

This project was made possible by the Village receiving up to 70% funding through the Coronavirus Response and Relief Supplemental Appropriations Act (CRRSAA).  Since the funding is provided through the state of Illinois, the project was let through IDOT’s system and awarded to R.W. Dunteman Company.  IDOT will additionally provide contract management for the duration of the project, while Robinson Engineering, Ltd. will provide construction engineering services.

If you have any questions, please contact our Public Works at (630) 773-2455 or the field engineer, Mr. Robert Borchering of Robinson Engineering, Ltd., at (708) 473-8068.

See below for Project limits and Planned Detour

Bloomingdale Limits


Bloomingdale Detour Route
  1. Bloomingdale Road Reconstruction - Weekly Update June 5th, 2023

    For the remainder of this week, water services will be installed along N. Oak Street and sidewalks, curb replacements will be framed and poured along N. Elm Street, and storm sewer installation along Division Street and N. Maple Avenue will continue. Read on...
  2. Bloomingdale Road Reconstruction - Weekly Update May 26th, 2023

    Beginning Tuesday, May 30th the Contractor will be installing storm sewer on Division Street, between N. Walnut Street and N. Maple Street. Division Street will be closed to through traffic and traffic will be detoured. Read on...
  3. Bloomingdale Road Construction Update - Week of May 22, 2023

    For the remainder of the week, the Contractor will continue pavement patching. Please use caution around the protruding frames. Read on...